Summary

The Ebro River has received large amounts of industrial waste, particularly in the Flix reservoir area, where a chlor-alkali plant accumulated around 500,000 tonnes of contaminated materials containing compounds such as PCBs, DDT, polychlorinated naphthalenes, hexachlorobenzene (HCB), pentachlorobenzene, and mercury, as well as phosphate residues. The river flow contributed to the dispersion and erosion of these contaminants, which were subsequently detected in water, sediments, soils, fish, and birds, in some cases at very high concentrations. Many of these compounds are regulated under the Stockholm Convention and are associated with harmful effects such as cancer, endocrine disruption, reproductive disorders, oxidative stress, immunotoxicity, and developmental defects.

In addition to aquatic contamination, atmospheric impacts were also detected, including the presence of volatile organic compounds such as trichloroethylene, tetrachloroethylene, and HCB in the air of the area, as well as their dispersion over several kilometres, reflected even in vegetation contamination and elevated levels in the local population. Following the implementation of a remediation programme that culminated in the complete removal of the waste in 2023, the project aims to assess the environmental recovery of the river system 12 years after the isolation of the residues. To this end, different environmental compartments (water, sediments, air, soils, and biota), as well as food products and emerging contaminants, will be analysed in order to determine the current environmental health status of the lower Ebro River, the degree of recovery, and any remaining risks to ecosystems and human health.

Project PID2023-146639NB-I00 funded by MICIU/AEI /10.13039/501100011033 and FEDER, UE

Principal Investigators

Staff